SC DOT says the US 1 Bridge over the Wateree River will begin lane closures on Friday night July 12th at 7:00 pm and will continue to have lane closures during the day Saturday July 13th through Noon on Sunday July 14th. This work will consist of concrete patching on the bridge deck. SC DOT is hopeful that this will be the last of the daytime lane closures barring any unforeseen events or weather. There will continue to be night time closures and ongoing work.